4.8 Google reviewsoffice@macdonaldcrane.comMost weeks book up. Call two or three days ahead.

Roofing Material Crane Lifting for Contractors Across Southeastern Massachusetts, Boston, Cape Cod, Rhode Island & Southern New Hampshire

  • NCCER-certified operators
  • Clear pricing before the lift
  • Loading roofs since 2009

Request a Lift Quote

Material on the Ground Is Not Material on the Roof

When the delivery is stacked in the lot and the crew is already up top, the whole job waits on one thing. Every hour the load sits on the ground is an hour you are paying a crew to stand still.

At MacDonald Crane, we lift roofing material onto commercial roofs for roofing contractors. Most of that work is a run of repeat picks rather than one lift, so the crane sets up once in the morning and stays with you while the load goes up.

The number we ask for first is what a single pick weighs. You choose how the material gets banded, and that choice is a large part of how many trips the crane makes.

If the bundles are not made up yet, tell us the order and the building, and we will work the picks out with you. A photograph taken from the lot is usually enough to start.

A wrapped load on slings lifted high over the power lines by a MacDonald Crane boom truck

What Size Crane Does a Roof Load Need?

Add up the whole delivery and you get a number that means nothing to a crane. A roof load does not go up in one piece. The machine gets chosen on the heaviest single pick, the height it has to go and how far out it has to be placed, and the first of those is yours to decide.

Call (508) 238-1055

The Cranes Behind This Work

The crane choice depends on the pick weight, roof height, distance and setup area.

The Manitex 30100C 30-ton boom truck with its boom raised beside a commercial building

Manitex 30100C · 30-Ton Boom Truck Crane

A 100-foot main boom. It handles most material loading on commercial roofs where the crane can park alongside the building and work over the edge.

The Manitex 50128S 50-ton boom truck with its boom raised

Manitex 50128S · 50-Ton Boom Truck Crane

A 128-foot main boom in four sections. It goes out for taller buildings, and for roofs where the picks have to land well back from the edge.

What Settles a Roof Load

A MacDonald Crane boom truck with its boom raised high beside a multi-storey commercial building

What one pick weighs. Not the order total. A bundle of architectural shingles runs about 65 to 80 lbs and three bundles cover a square, so multiply that out for the way you intend to band it. Give us the heaviest one.

How high it has to go. Roof height, plus the parapet and anything overhead between the lot and the landing spot. On a low commercial building this is rarely the limit, though it does change where we can set up.

How far in the crew wants it. Material landed at the edge still has to be carried across by hand. Tell us where the work is happening and we will put it there instead, as far as the crane can reach.

Give us those three and we can usually work out the crane and the number of trips before the material is ordered.

Tell Us What One Pick Weighs

You do not need the full order to start. Tell us the heaviest single pick, the roof height, and how far in the crew wants the material. That is usually enough for us to size the crane and put a realistic length against the loading.

  • Weight per pick

  • Roof height

  • Distance from the edge

Not sure yet? Send a photograph of the building and the lot, and tell us the size of the order. That is usually enough. Or call (508) 238-1055.

Send It Over

What Backs Up the Booking

2009loading roofs out of Easton since
9 in 10bookings come from a trade we have worked for already
1 daywhat a certificate of insurance takes to reach you
NCCERthe ANAB-accredited program behind every operator we send

How Does a Loading Day Run?

  1. Before the date.

    We agree the crane, where it parks and how many picks you are expecting. If the material has not been delivered yet, we work from the order instead.

  2. On arrival.

    The crane sets its outriggers down on pads, and the operator walks the sequence through with whoever is running the roof before the first pick leaves the ground.

  3. The picks.

    The load goes up in the order your crew wants it, spread across the roof rather than left in one heap. The operator waits on the crew between picks.

  4. Off the site.

    Once the last pick is up, the crane packs down and clears the lot. Surplus material can come back down the same way if you say so on the day.

What the Roof and the Lot Need

We bring

  • The machine, the operator, and the hardware to sling a banded load
  • Pads for the outriggers, sized for the ground we are parking on
  • The insurance certificate the main contractor will ask for
  • Rigging matched to bundles, rolls or panels

You arrange

  • Material banded and ready before we get there
  • A parking spot beside the building, kept clear of vehicles
  • A crew on the roof to take each pick and spread it out
  • Somewhere the load can sit without going down in one heap

We do not pull permits and we do not book police details. That sits with whoever is running the job. If the crane has to stand on a public street or take a sidewalk, start with the town early. That approval is outside anything we can speed up.

A MacDonald Crane boom truck set up in the lot of a commercial office building

4 Reasons Roofers Call Us Back

You Decide How Big Each Pick Is

Band the material heavier and you get fewer trips and a shorter booking. Band it lighter and you get more picks but an easier landing for the crew. Tell us which way you want to work it and we can show you what it does to the hours.

We Land It Where the Crew Is Working

Material dropped at the roof edge still has to be moved across by hand. Within the crane's reach we put each pick down where the work is actually happening, so the crew spends the day laying material rather than carrying it.

A Banded Load Gets Rigged for What It Is

Bundles and rolls do not sling like one solid object. We rig a banded pick for the shape it actually is, so the load arrives on the roof looking the way it looked in the lot.

We Will Say If You Do Not Need a Crane

A small re-roof with good ladder access is often quicker on a hoist than with a crane sitting in the lot. If that is your job, we will say so on the call, not after you have booked.

What Fills the Hours on a Loading Day?

The number of picks is the main driver, and you control that through how the material is banded. The size of the machine sets both the rate and the minimum hours. How fast your crew clears each pick decides how much of the booking goes on lifting rather than waiting. And distance counts, because the hours run port to port from the yard in Easton.

Tell us the order size along with the address, and we can put a realistic number of hours against it before the delivery lands.

A Manitex boom truck crane with its boom stowed, ready to drive out to a job Hourly rates, minimums and how we bill »

Where We Load Roofs

Based in Easton, MacDonald Crane serves roofing contractors across Southeastern Massachusetts and surrounding areas.

See our full service area »
  • Norfolk County
  • Braintree
  • Canton
  • Dedham
  • Foxborough
  • Quincy
  • Sharon
  • Stoughton
  • Walpole
  • Suffolk County
  • Boston
  • Chelsea
  • Revere
  • Winthrop
  • Worcester County
  • Auburn
  • Milford
  • Northborough
  • Shrewsbury
  • Westborough
  • Worcester

FAQs

How many picks fit into one booking?

As many as the booked hours cover. The crane stays set up between picks, so the real limit is how fast your crew clears each one off the roof.

Do you load metal roofing and rolls?

Yes. Panels, rolls and banded bundles all go up the same way. Tell us the longest piece, because length changes how a pick has to be slung.

Can you land material away from the edge?

Usually. It comes down to what the pick weighs and how close we can get to the building. Send us both and we can work it out before the date.

Do you take the old material away?

We can bring it down onto whatever is taking it off site. Hauling it away is a separate conversation, so raise it when you book.

Do we need a crew up on the roof?

Yes. Somebody has to take each pick and spread the load out. The operator will not release a pick onto an empty roof.

Google Reviews

What Our Customers Say

4.8 Google reviews
  • Google review

    As the CFO of Climate Design Systems & Merrimack Valley Corporation, MacDonald Crane has been a very reliable partner to us and has always come through. Their prices are very competative to other local crane companies and they deliver! I highly recommend.

    Keith Bentley, Google reviewerKeith BentleyGoogle reviewRead on Google
  • Google review

    10 years ago they delivered and placed four rooftop units to my job site. They were punctual, professional and the driver was a hot ticket. Will definitely use them again.

    Gary Vitagliano, Google reviewerGary VitaglianoGoogle reviewRead on Google
  • Google review

    Very reliable & safety is their #1 concern

    Cheryl O'Donnell, Google reviewerCheryl O'DonnellGoogle reviewRead on Google
  • Google review

    I have a hot tub business and use MacDonald exclusively for crane service. Best around!

    Roger Mayer, Google reviewerRoger MayerGoogle reviewRead on Google

Get the Load Off the Lot and Onto the Roof

The material is in the lot, the crew is on the roof, and every hour it stays down there costs you both. Tell us the heaviest pick, the roof height and how far in the crew wants it, and we will come back with the machine and the number of trips.

Call (508) 238-1055