4.8 Google reviewsoffice@macdonaldcrane.comMost weeks book up. Call two or three days ahead.

Operated Crane Rental in Easton, MA, Serving Southeastern Massachusetts, Boston, Cape Cod, Rhode Island & Southern New Hampshire

  • NCCER-certified operators
  • Insurance certificate in one business day
  • Working out of Easton since 2009

Request a Lift Quote

Some Loads Need More Than a Forklift

You have equipment that needs to land on a roof or reach a position a forklift cannot access. Until that lift is complete, the work that follows it cannot move forward.

At MacDonald Crane, we provide operated crane rentals for commercial contractors. Our work includes rooftop HVAC equipment, refrigeration condensers, generators and other equipment that needs to be lifted into position.

Where the crane can set up is one of the first things we need to know. The setup point, along with the load and the height it needs to reach, determines which crane can make the lift.

If you do not have those details yet, send us a photo of the setup area. We can start working through the lift with you before the date is booked.

A packaged rooftop unit on slings beside a commercial building, photographed from the roof

How Do You Choose the Right Crane for the Job?

Start with tonnage and you can end up with the wrong answer. A 50-ton rating applies at a six-foot radius, so it tells you very little about what the crane can lift at the distance your job actually requires. Three measurements help determine which crane the lift needs.

Call (508) 238-1055

The Cranes We Run

We operate two boom truck sizes for commercial lifting work.

The Manitex 30100C 30-ton boom truck with its boom raised over packaged rooftop units

Manitex 30100C · 30-Ton Boom Truck

With 100 feet of main boom, this boom truck handles commercial lifts including rooftop HVAC equipment, refrigeration condensers, generators, structural steel and roofing materials.

The Manitex 50128S 50-ton boom truck with its boom raised

Manitex 50128S · 50-Ton Boom Truck

With 128 feet of main boom in four sections, this boom truck provides additional capacity and boom length for lifts that require more than the 30-ton can provide at the job's actual setup and reach.

The Three Things We Ask For

A MacDonald Crane boom truck reaching out over power lines with a packaged unit on the hook

What the load weighs. We need the actual weight of what is being lifted, including rigging and anything still attached. Equipment rated in tons of cooling is not rated in tons of weight.

How high it has to go. Give us the roof height plus anything the load needs to clear on the way, such as a parapet, canopy or other obstruction.

How far from the crane it has to land. We need the distance from where the crane can set up to where the load will sit. That distance affects which crane can make the lift.

Send us those three details and we can determine which crane best fits the lift before you schedule the crew.

Tell Us the Lift Details and We Will Assess the Job

Send us the load weight, height it must clear and distance from the crane setup point. We can use those details to assess which crane best fits the lift before you schedule your crew.

  • Load weight

  • Height the load must clear

  • Distance from crane setup to final position

Not sure yet?

Don't have the measurements? Send a photo of the setup area instead, or call (508) 238-1055 to discuss the lift.

Request a Lift Quote

Certified, Insured and Working Since 2009

2009Operating from Easton since the first MacDonald crane went out.
9 in 10 jobsBooked by contractors who have worked with us before.
1 business dayCertificate of insurance turnaround from your request.
NCCEREvery operator we send holds NCCER certification.

What Happens on the Day of the Lift?

  1. Before the Date

    You send the load weight, the height it must clear and the distance from the crane setup point. We review the lift and confirm the crane and site conditions needed for the scheduled work.

  2. The Lift Plan

    If requested, we can prepare a 3D lift plan showing the crane position and the path the load needs to take.

  3. Setting Up

    The operator positions the crane, sets the outriggers and walks through the pick with the person running the job before anything comes off the ground.

  4. The Lift

    The operator completes the lift and places the load in its final position. Once the work is complete, the crane is packed down and the site is cleared.

What We Bring and What You Arrange

We Bring

  • The crane and operator who runs it
  • Slings, shackles and rigging needed for the lift
  • Outrigger pads to support the crane during setup
  • A certificate of insurance, provided within one business day of your request

You Arrange

  • A level, clear setup area for the crane
  • Clear access for the crane, including open gates and moved vehicles
  • Have the equipment ready for the lift, or ask about equipment transportation

We do not pull permits, arrange street permits or schedule police details. Those responsibilities sit with whoever is running the job, so confirm any required permits and traffic arrangements before the lift date.

A MacDonald Crane boom truck with its boom raised beside a multi-storey commercial building

4 Reasons Contractors Call Us Back

Right-Sized Cranes, Faster Setup

Our boom trucks arrive ready to set up without a separate assembly process. That helps contractors schedule lifts efficiently without adding unnecessary setup time.

Clear Rates Before You Book

Hourly rates, minimum hours and billing details are published before you call. Contractors can understand the pricing structure before scheduling their lift.

The Operator Comes With the Crane

Every crane goes out with the operator who runs it. You do not need to arrange a separate operator or coordinate equipment and personnel from different providers.

We Know Which Lifts Fit Our Fleet

Our fleet includes 30-ton and 50-ton boom trucks. If a lift requires equipment beyond what we operate, we will tell you before the date is scheduled.

What Drives the Cost of a Crane Rental?

The cost of a crane lift depends on the equipment required, the job setup and the time involved. The crane size, the complexity of the setup, the number of lifts required and the location of the job all affect the overall cost.

The crane required for the lift matters because different equipment sizes have different minimums and rates. The jobsite setup also affects how the crane can be positioned and how the lift is completed.

The number of lifts required can change the scope of the work. For example, equipment replacement projects may involve removing existing equipment before setting the new equipment.

For a clearer breakdown of hourly rates, minimums and billing details, visit our rates page.

A MacDonald Crane boom truck setting its outriggers beside a building Hourly rates, minimums and how we bill

Where You Can Find Our Cranes

Based in Easton, MacDonald Crane serves contractors throughout Southeastern Massachusetts and surrounding areas.

Service areas:

See our full service area »
  • Norfolk County
  • Braintree
  • Canton
  • Dedham
  • Foxborough
  • Quincy
  • Sharon
  • Stoughton
  • Walpole
  • Suffolk County
  • Boston
  • Chelsea
  • Revere
  • Winthrop
  • Worcester County
  • Auburn
  • Milford
  • Northborough
  • Shrewsbury
  • Westborough
  • Worcester

FAQs

Do you rent cranes without an operator?

No. Every crane rental includes the operator who runs it. We do not provide bare crane rentals.

Do you handle the rigging as well?

Yes. We handle rigging for the loads we lift using the slings and shackles required for the job.

How far ahead should I book a crane?

We recommend scheduling your lift at least two or three days ahead. Earlier notice gives us the best chance of fitting your preferred date.

What do operated crane rates include?

Rates include the crane, operator, minimum hours and applicable fuel charge. See our rates page for current pricing details.

What paperwork do you send before the lift?

We provide a certificate of insurance within one business day of your request. Ask early if your general contractor requires additional paperwork.

Google Reviews

What Our Customers Say

4.8 Google reviews
  • Google review

    As the CFO of Climate Design Systems & Merrimack Valley Corporation, MacDonald Crane has been a very reliable partner to us and has always come through. Their prices are very competative to other local crane companies and they deliver! I highly recommend.

    Keith Bentley, Google reviewerKeith BentleyGoogle reviewRead on Google
  • Google review

    10 years ago they delivered and placed four rooftop units to my job site. They were punctual, professional and the driver was a hot ticket. Will definitely use them again.

    Gary Vitagliano, Google reviewerGary VitaglianoGoogle reviewRead on Google
  • Google review

    Very reliable & safety is their #1 concern

    Cheryl O'Donnell, Google reviewerCheryl O'DonnellGoogle reviewRead on Google
  • Google review

    I have a hot tub business and use MacDonald exclusively for crane service. Best around!

    Roger Mayer, Google reviewerRoger MayerGoogle reviewRead on Google

Confirm the Crane Before the Crew Arrives

A crane that cannot make the pick can delay the crew, delivery and work scheduled around it. Send the load weight, the height it must clear and the distance from crane setup to final position, and we can assess which crane best fits the lift.

Call (508) 238-1055