4.8 Google reviewsoffice@macdonaldcrane.comMost weeks book up. Call two or three days ahead.

Shipping Container Crane Lifting for Sites Across Southeastern Massachusetts, Boston, Cape Cod, Rhode Island & Southern New Hampshire

  • Set level on your blocking
  • NCCER-certified, ANAB-accredited operators
  • Easton yard, running since 2009

Request a Lift Quote

The Delivery Stops at the Gate

When a container has to end up somewhere a trailer cannot back into, the delivery stops at the gate. The box stays on the trailer, the spot you cleared for it sits empty, and the driver is on the clock.

At MacDonald Crane we lift shipping containers and set them where they have to go, for contractors, storage yards and facilities teams. Some of that is a box going in behind a building. Some of it is lifting one back out years after somebody set it there.

What we want to know first is what sits overhead. A container is picked from its four top corners, so the rigging stands above the roof of the box. Clearance over the spot decides the pick more often than the way in does.

Most people have not measured that when they call. Send a photograph taken from wherever a crane could stand, looking at the spot, and we will talk the pick through with you before you take a delivery date.

A MacDonald Crane boom truck rigged to a large boxed generator on a delivery trailer, the crew and cones around it

How Big a Crane Does a Container Need?

Length will not answer this. An empty twenty-foot box weighs somewhere around 5,000 lbs. The standard it is built to allows that same box up to 67,200 lbs loaded, thirteen times its own weight. What is inside decides the crane far more than how long the box is.

Call (508) 238-1055

The Cranes That Pick Them Up

Overhead clearance and the distance to the spot usually decide which one comes out.

The Manitex 30100C 30-ton boom truck with its boom raised beside a commercial building

Manitex 30100C · 30-Ton Boom Truck Crane

The one to reach for when the way in is narrow. Its main boom runs 100 feet in four sections, and it gets into fenced yards and gravel lots where there is one lane in and nowhere to turn around. See the 30-ton boom truck crane »

The Manitex 50128S 50-ton boom truck with its boom raised

Manitex 50128S · 50-Ton Boom Truck Crane

Loaded containers and stacked ones are what this one is for. It carries 128 feet of main boom across four sections, and it is the machine for a box that has to travel over something instead of around it. See the 50-ton boom truck crane »

Three Measurements, Then the Machine

A load lifted over power lines by a MacDonald Crane boom truck

What the container weighs, loaded or empty. The plate by the door carries both the empty weight and the most the box is rated to carry. Read us those, and tell us whether anything is actually going up inside it.

The height it has to clear. Measure to whatever sits over the spot, and then add room for the rigging above the roof of the box. Low branches, a canopy, an overhang or overhead wires stop more container picks than weight does.

The distance from the crane's ground to the final spot. Measure it, and tell us what sits in between as well, whether that is a fence line, a dumpster or parked vehicles.

With those three we can name the crane before anybody books a date.

Send These Three Before You Book the Delivery

Those three settle which crane the box takes and how many hours to put against it. They also flag anything over the spot that needs sorting out before the delivery date.

  • Container weight, loaded or empty

  • Height it must clear

  • Distance to final position

No plate reading? A photograph of the spot and one of the way in will get us most of the way. Or call (508) 238-1055.

Send It Over

What Stands Behind the Pick

2009the year a MacDonald crane first went out of Easton
9 in 10of the bookings we take are from contractors we have lifted for before
1 dayask for a certificate of insurance and it goes out inside one business day
NCCERthe program our operators are certified through, accredited by ANAB

How Does a Container Actually Get Set?

  1. Before the date.

    We take the plate reading, what the box has to clear, and how far it lands from the crane's ground. You get the machine and the hours back.

  2. Hooking it up.

    The rigging goes on the four top corner fittings, about eight and a half feet up on a standard box. The operator finds ground that will hold the outriggers and sets up on it.

  3. The pick.

    The box comes off the trailer and swings in on the line the operator set. Your people work the tag lines so it does not turn, and it comes down slowly over the blocking.

  4. Trying the doors.

    It lands on the blocking, and the doors get opened and shut before the rigging comes off. If the box is sitting off level, the crane is still there to lift a corner while you shim it.

What the Spot Needs Before Delivery Day

We bring

  • An NCCER-certified operator, on every crane that leaves the yard
  • Rigging that takes the load vertically off the four top corners
  • Pads and cribbing under the outriggers
  • A certificate of insurance, inside one business day if you need it

You arrange

  • Blocking or piers at the four corners, set level before the crane arrives
  • Somewhere firm and level to set up, with nothing parked across the way in
  • Two people on the ground for the tag lines and the doors
  • Any street permit, and the police detail if the crane has to sit in the road

That last one is not something we handle. We do not pull street permits and we do not book police details, and it sits with whoever is running the job. Get that moving once the date looks firm.

A MacDonald Crane boom truck with its outriggers down in a tight lot between buildings

4 Reasons the Box Lands Right

We Ask What It Lands On

Before the date we want to know what the box is coming down onto. A container set off level takes a twist through the frame, and the door opening goes out of square. You find that out the first time the doors will not shut.

It Lands Facing Where You Load

Which way the doors point gets settled on the hook, and turning a forty-foot box in a tight yard takes room. Tell us which end you will be working from and the operator brings it in facing that way. Changing it afterwards means another crane.

We Work to the Trailer's Window

The box arrives on somebody else's trailer with a driver waiting. Tell us what time that delivery is due and we will build the booking around it. Two vendors and one window is where a container job usually slips.

We Can Lift One Back Out

Plenty of what we get called for is a box that has been in the same spot for years, with the ground settled under it and a fence built since. Tell us what is around it now and we will say what getting it out takes.

What Drives the Cost of a Container Lift?

Four things fill the hours on a container job. Getting the crane onto ground that will hold it is the first, and on a gravel yard that takes longer than most people expect. The second is how far the spot sits from there. The third is whether the box is loaded, and the fourth is the drive, which runs port to port from Easton.

The blocking is the part you control. Have it set and level before the box arrives, and it goes down once.

A MacDonald Crane boom truck on a gravel yard setting a boxed generator down onto its pad Hourly rates, minimums and how the clock runs

Where We Set Containers

Easton is the base. These are the counties we set containers in, and some of the towns in each.

See our full service area »
  • Norfolk County
  • Braintree
  • Canton
  • Dedham
  • Foxborough
  • Quincy
  • Sharon
  • Stoughton
  • Walpole
  • Suffolk County
  • Boston
  • Chelsea
  • Revere
  • Winthrop
  • Worcester County
  • Auburn
  • Milford
  • Northborough
  • Shrewsbury
  • Westborough
  • Worcester

FAQs

Can a crane reach a spot behind the building?

Usually, and it turns on how far the spot sits from the closest firm ground. Give us that and we will say.

Does the container have to be empty?

No. Tell us what is in it and roughly what that weighs. A loaded box can change which crane comes out.

What should the container sit on?

Level blocking or piers under the four corners is the usual answer. Have it in place before the date.

Can you stack one container on another?

Containers are built to stack at the corners, so what decides it is the height and the distance. Send both and we will say.

How far ahead should we book?

Two to three days is usual. Call sooner if the spot is somewhere a crane has to work its way into.

Google Reviews

What Our Customers Say

4.8 Google reviews
  • Google review

    As the CFO of Climate Design Systems & Merrimack Valley Corporation, MacDonald Crane has been a very reliable partner to us and has always come through. Their prices are very competative to other local crane companies and they deliver! I highly recommend.

    Keith Bentley, Google reviewerKeith BentleyGoogle reviewRead on Google
  • Google review

    10 years ago they delivered and placed four rooftop units to my job site. They were punctual, professional and the driver was a hot ticket. Will definitely use them again.

    Gary Vitagliano, Google reviewerGary VitaglianoGoogle reviewRead on Google
  • Google review

    Very reliable & safety is their #1 concern

    Cheryl O'Donnell, Google reviewerCheryl O'DonnellGoogle reviewRead on Google
  • Google review

    I have a hot tub business and use MacDonald exclusively for crane service. Best around!

    Roger Mayer, Google reviewerRoger MayerGoogle reviewRead on Google

Set It Once, Set It Right

A container goes in once and stays where you put it. Send the weight, what the box has to clear, and how far the spot is from where a crane can park, and you will have the machine and the hours before you take a delivery date.

Call (508) 238-1055