Manitex 30100C · 30-Ton Boom Truck Crane
One hundred feet of main boom. It covers a lot of condenser work, from a single unit on a strip-mall roof to a restaurant job where there is room to park close in. More on the 30-ton »
When a condenser has to come off a grocery roof, nothing else about that day is flexible. The cases still have to hold temperature, the doors open at the usual hour, and your refrigeration crew ends up on a roof waiting on the crane.
At MacDonald Crane, we take condensers off commercial roofs and put the replacements up, for grocery stores, restaurants and cold storage buildings. Much of it is change-out work, and there is rarely just one unit.
What we need first is how far in from the edge the condenser sits. A condenser is wide and light for its size. Where it lands is often just as important as what it weighs when determining the right crane.
You may not have that yet, and it is not a problem. Send a photograph taken from the lot, showing the building and the ground a crane would have to stand on. That is usually enough for us to tell you how the lift would run, well before the date.

Tonnage is the number everyone reaches for first, and it answers almost nothing. A 50-ton rating is measured with the load right beside the machine. Push that same load out over a parapet and across a roof and the figure drops away fast. Weight, height and distance settle it.
Call (508) 238-1055
Condenser work splits between two sizes.

One hundred feet of main boom. It covers a lot of condenser work, from a single unit on a strip-mall roof to a restaurant job where there is room to park close in. More on the 30-ton »

The 128-foot boom, in four sections. It gives you more capacity and more reach when the condenser sits deep in the roof, or the crane has to work from the far side of the lot. More on the 50-ton »

What the condenser actually weighs. Give us the real number off the data plate, not the tonnage of refrigeration on the model line. A four-fan condenser rated around 40 tons of refrigeration weighs closer to 1,800 lbs than to 40 tons.
What it has to clear. Roof height first, and then everything the load passes on the way up. On a grocery building that usually means a parapet, a screen wall around the existing units, and the power lines over the lot.
How far in it lands. How far the condenser sits from the ground a crane can work from. Hardly anyone has this ready, and on a wide flat roof it decides the pick more often than weight.
Send those three and we can determine which crane best fits the lift requirements.
Most of this gets settled on the phone. Tell us what the condenser weighs, how high the roof is and how far back from the edge it sits, and we can review the crane requirements and expected lift scope.
Not sure yet? One photo taken from the lot, looking at the building, tells us most of it. Send that instead, or call (508) 238-1055.
Tell us how many units are coming off and going up, with the three numbers. We confirm the machine, the hours to allow and what has to be clear.
On a crowded roof we can put the pick into a 3D model first. It shows where the machine sits and what the condenser gets past on the way over. Say so when you book.
The operator gets the crane onto its spot, sets the outriggers on pads and walks the lift through with your refrigeration lead before anything leaves the ground.
The old condenser comes off, the new one goes up, and any others run back to back off the same setup. The operator packs down and goes.
We do not pull street permits and we do not book police details. That sits with whoever schedules the job. On a retail site the parking lot is usually the harder permission to get, so ask the property manager early.

A grocery lot is not just parking, it is how your customers get in. Our cranes sit on a truck chassis and work from where they park, so the footprint is one corner plus the room the boom swings through. We agree which rows get coned before the date.
A supermarket roof already carries a rack, ductwork, screening and the units you are not touching. On request we draw the whole pick in 3D first. You find out whether the boom clears the screen wall while there is still time to change where the machine sits. How lift planning works »
Roofs rarely carry a single condenser. Once the crane is set and the outriggers are down, the units come off and go on one after another from the same position, and you are not paying to set up twice. Tell us the count when you call.
The condenser you take off still has to leave the site. We move equipment as well as lift it. Ask when you book and we will let you know what we can move and where it can go. That is one call rather than two.
Four things fill the hours here. The first is which machine it takes, and the two sizes carry different rates and different minimums. The second is how many condensers go up and come down. The third is how much of the lot you can hand over, because a tight setup takes longer to get level. The fourth is the distance, and the clock runs from our yard in Easton and back to it.
We can put hours against all four once we have the numbers and the address. Ask early and the hours are settled before you put a crew on the date.
What the cranes cost by the hour
Our yard is in Easton, and these are the areas a crane goes out to.
Yes. The lift happens over the lot rather than the sales floor, and we set the crane where your customers and your deliveries are not underneath it.
Usually, yes. Once the crane is set up the picks run back to back from the same spot. Tell us the count when you call.
We can. Moving equipment is a separate part of what we do. Raise it when you book the crane.
It depends on how far in the unit lands. The 30-ton covers a lot of this work, and the 50-ton comes when the machine has to stand well back.
Yes. Restaurants, grocery stores and cold storage buildings all get the same service, and a smaller restaurant unit is a routine pick for us.
As the CFO of Climate Design Systems & Merrimack Valley Corporation, MacDonald Crane has been a very reliable partner to us and has always come through. Their prices are very competative to other local crane companies and they deliver! I highly recommend.
Keith BentleyGoogle reviewRead on Google 10 years ago they delivered and placed four rooftop units to my job site. They were punctual, professional and the driver was a hot ticket. Will definitely use them again.
Gary VitaglianoGoogle reviewRead on Google Very reliable & safety is their #1 concern
Cheryl O'DonnellGoogle reviewRead on Google I have a hot tub business and use MacDonald exclusively for crane service. Best around!
Roger MayerGoogle reviewRead on Google
A crane that cannot reach the condenser leaves your crew on the roof and the store waiting. Send us what it weighs, how high the roof is and where on the roof it goes, and we will tell you what the pick takes.