Steel Beam Lifting for Contractors Across Southeastern Massachusetts, Boston, Cape Cod, Rhode Island & Southern New Hampshire

  • Beams supported through connection
  • NCCER-certified crane operators
  • Lifting out of Easton since 2009

Request a Lift Quote

Nothing Gets Bolted Until the Beam Is There

A steel job moves one piece at a time. Your crew is up on the frame with the bolts ready, and until the beam reaches them the work stops there.

At MacDonald Crane we set structural steel for erectors and general contractors around southeastern Massachusetts. Much of the work involves short steel installed inside existing buildings that already stand, so mezzanine beams, headers, canopy framing and one-off replacements.

What we want first is the heaviest piece on the list and how far in from the crane it has to land. The tonnage on your delivery ticket will not size the machine. One piece does.

If the shop drawings are not back yet, that is fine. Send whatever piece list you have and a photograph taken from the street, and we can work the picks out with you well before a date is booked.

A MacDonald Crane boom truck with its flatbed loaded with steel, parked on a city street

What Decides the Crane on a Steel Job?

The number on the delivery ticket is the wrong place to start. Steel arrives as a dozen separate pieces and the machine gets sized against the heaviest single one, at the distance it has to travel. Twelve tons of steel in twelve picks is a smaller job than one twelve-ton girder.

Call (508) 238-1055

The Machines That Set Steel

Crane selection depends on the piece weight, working distance, height and available setup area.

The Manitex 30100C 30-ton boom truck with its boom raised beside a commercial building

Manitex 30100C · 30-Ton Boom Truck Crane

Short steel projects close to the setup area are often suited for this crane. One hundred feet of main boom, and a footprint that suits a tight lot where the frame sits close to where you can set up.

More on the 30-ton →
The Manitex 50128S 50-ton boom truck with its boom raised

Manitex 50128S · 50-Ton Boom Truck Crane

This one carries more capacity and a main boom out to 128 feet. Steel going up high, or landing well inside a site, is the usual reason it gets sent.

More on the 50-ton →

The Heaviest Piece Decides

A MacDonald Crane boom truck lifting a long pole into place beside a sports field

What the heaviest piece weighs. Steel tells you this itself. The size stamped on the piece carries the weight per foot, so a W12x26 runs about 26 pounds a foot and a 30-foot length of it comes to roughly 780 pounds.

The height it sets at. Measure to the underside of the connection rather than the top of the frame, then add anything the piece travels over on the way. On an occupied site that is usually a roof, a screen wall or the wires across the lot.

How far in it lands. Pace it out from wherever a machine could safely set up, over to the furthest connection you want made from that one spot. If the whole package will not come off a single setup, tell us.

Those three are what the machine gets chosen on.

Send the Numbers Before the Steel Is Delivered

Most steel jobs get settled on the phone. Give us the heaviest piece on the list, the height it sets at and how far in it lands. We can usually put a machine and a run of hours against it from that.

  • Heaviest piece

  • Height it sets at

  • Distance from setup point

No shop drawings yet? Send one photograph from the street and one from where the frame goes. Or call (508) 238-1055.

Send It Over

What Sits Behind Every Pick

2009the year this became a working crane yard in Easton
9 in 10of what goes on the schedule is a returning contractor
1 daywe turn a certificate of insurance around inside one business day
NCCERan ANAB-accredited program certifies every operator we send

How Does the Day Run When Steel Goes Up?

  1. Before the date.

    You send the piece list, the height and the distance. We answer with the machine, the rigging it takes and how many hours the picks should run.

  2. Setting up.

    Your foreman and the operator settle on a spot the crane can make every connection from. Pads go down and the outriggers come out.

  3. The picks.

    Pieces come off the laydown area in the order they go up. A tag line keeps the beam straight while it travels, and your crew takes it at the connection.

  4. Holding and releasing.

    The operator holds the piece steady while your ironworkers bolt or weld it up. Nothing comes off the hook until they call it, and then the next one comes over.

What the Site Needs Before the Steel Arrives

We bring

  • An operator certified under NCCER, sent with the crane
  • Rigging sized for your pieces, slings, shackles and a spreader bar for long steel
  • Outrigger pads and cribbing for soft or uneven ground
  • Your certificate of insurance, inside one business day

You arrange

  • The steel delivered and laid down somewhere a crane can reach it
  • Firm, level ground for the setup, with the way in kept clear
  • Your ironworkers on site to take each piece and make the connection
  • Any street permit, and a police detail if the setup sits in the road

We do not pull street permits and we do not book police details. Whoever schedules the job owns both, so get the application in as soon as the date firms up.

A MacDonald Crane boom truck with its boom raised beside a multi-storey commercial building

4 Reasons Steel Erectors Book Us Back

The Hook Time Is the Connection

On steel the pick itself is the quick part. Most of the hour goes on the piece hanging there while your crew makes it up, and we quote the day that way. The operator allows the connection process to be completed before moving to the next pick.

We Size From the Heaviest Piece

Send the list and we work off the worst one on it. A package that looks big on the ticket is often a straightforward set, and a light package with one long girder in it is not.

Long Steel Comes In Level

A long beam picked from a single point tips and swings on the way over. We rig those from two points instead, so the piece travels flat and comes down where your crew is standing rather than somewhere near them.

We Say When a Piece Is Beyond Us

Some steel wants a bigger machine than we run. We will say so on the first call rather than on lift day, and we can usually point you at somebody who has it.

What Drives the Cost of Setting Steel?

Four things fill the hours. Getting into position and packing down again is the first, and how many separate picks the package takes is the second. The third is how long each piece hangs while your crew makes the connection. The fourth is the drive, billed port to port from Easton. A package that sets from one spot runs shorter than the same steel reached from three.

Two of those four are yours to shorten. Have the pieces laid out in the order they go up, keep the approach clear, and the crane is picking instead of waiting.

A MacDonald Crane boom truck set up beside a brick building Hourly rates, and the minimum each crane books at

Where We Send a Crane

Based in Easton, MacDonald Crane serves steel erectors and contractors throughout Southeastern Massachusetts and surrounding areas.

See our full service area »
  • Norfolk County
  • Braintree
  • Canton
  • Dedham
  • Foxborough
  • Quincy
  • Sharon
  • Stoughton
  • Walpole
  • Suffolk County
  • Boston
  • Chelsea
  • Revere
  • Winthrop
  • Worcester County
  • Auburn
  • Milford
  • Northborough
  • Shrewsbury
  • Westborough
  • Worcester

FAQs

Do you supply the ironworkers?

No. You get the machine, the operator and the rigging. Your crew takes each piece and makes the connection.

What is the heaviest beam you can set?

That depends on how far we have to reach for it. Send the piece weight and the distance for a straight answer.

Can you set steel inside an existing building?

Yes, when the access opening, setup area and lift requirements allow it.

How many pieces from one setup?

As many as the reach covers. Mark the connections on a site plan and we can work it out from that.

Do we need a lift plan drawn?

Not usually. We draw one in-house on request, and a tight setup or an awkward piece is when to ask for it.

Google Reviews

What Our Customers Say

4.8 Google reviews
  • Google review

    As the CFO of Climate Design Systems & Merrimack Valley Corporation, MacDonald Crane has been a very reliable partner to us and has always come through. Their prices are very competative to other local crane companies and they deliver! I highly recommend.

    Keith Bentley, Google reviewerKeith BentleyGoogle reviewRead on Google
  • Google review

    10 years ago they delivered and placed four rooftop units to my job site. They were punctual, professional and the driver was a hot ticket. Will definitely use them again.

    Gary Vitagliano, Google reviewerGary VitaglianoGoogle reviewRead on Google
  • Google review

    Very reliable & safety is their #1 concern

    Cheryl O'Donnell, Google reviewerCheryl O'DonnellGoogle reviewRead on Google
  • Google review

    I have a hot tub business and use MacDonald exclusively for crane service. Best around!

    Roger Mayer, Google reviewerRoger MayerGoogle reviewRead on Google

Get Us the Piece List Early

The frame goes up in the order it can be reached, so the sooner we see the piece list the better your day runs. Send the heaviest piece, the height it sets at and how far in it lands, and we can come back with the machine and the hours.